Clear-juice finishing / Equipment
Enzyme treatment tank
Provide controlled holding for the selected clear-juice enzyme process.

What this equipment does
Place the enzyme treatment tank before downstream clarification and deaeration for the specified clear-juice route. Dose, temperature, residence time and enzyme inactivation must be set by product trials. Do not automatically apply a pectin-removal treatment to cloudy juice.
- INLET
- Pressed juice for a validated enzyme process
- OUTLET
- Conditioned juice before separation and deaeration
Your selection checklist
| Selection item | Required project information |
|---|---|
| 01 | Chosen enzyme and dosage trial |
| 02 | Holding time and temperature |
| 03 | Tank mixing and cleaning |
| 04 | Downstream separation and deaeration |
The equipment proposal must identify the actual model, its source specifications and the applicable operating conditions. Confirm capacity with the actual feed, product and agreed operating conditions.