Fruit handling / Equipment

Fruit reception & sorting

Define the quality and mass of the fruit entering the process.

INLETOUTLETFUNCTIONAL SCHEMATIC · NOT A MODEL

Functional schematic · not a model drawing

Define the duty before the model.

Reception, lot identification and sorting establish the inlet for the line. Record variety, maturity, storage condition and visible defects before comparing extraction results. Size handling and inspection to the intended receiving window rather than to an isolated press rating.

INLET
Delivered apples
OUTLET
Accepted fruit; sorted-out material
Include this equipment

Selection and acceptance conditions

Project-specific equipment schedule
Selection itemRequired project information
01Delivered container and unloading method
02Fruit condition and lot traceability
03Accepted fruit mass per hour
04Reject removal and hygienic access

The equipment proposal must identify the actual model, its source specifications and the applicable operating conditions. No unverified model rating is displayed here.

Where this equipment belongs

Ready for the next decision?

Let’s define your juice line.

Discuss your project